Skip to main content
. 2017 Dec 22;49(3):293–307. doi: 10.1007/s00723-017-0968-8

Fig. 4.

Fig. 4

Optimization of the SLIC-pulse amplitude, ν1, for generating the LLS in trans-AB. Duration of the SLIC-pulse was τrf=0.3 s, the delay between the two SLIC pulses was τ=10 s. Here the time τ was fixed, and we assume the same relaxation contribution to each of the measured points, B0=16.4 T. The signal intensity is given in percent of the thermal signal of trans-AB