Skip to main content
. 2018 Feb 23;9:34. doi: 10.3389/fmicb.2018.00034

Table 3.

Estimated effect, regression coefficient, and corresponding t- and P-values for BS production in central composite design experiments.

Name Coefficient F. Inflation Stand. Dev. t.exp. Signification %
b0 53.493 16.994 3.15 *
b1 −22.431 1.00 13.431 −1.67 12.3%
b2 35.853 1.00 13.431 2.67 *
b3 26.302 1.00 13.431 1.96 7.6%
b4 −16.769 1.00 13.431 −1.25 23.9%
b5 70.524 1.00 13.431 5.25 ***
b11 12.185 3.07 36.341 0.34 74.2%
b22 4.665 3.07 36.341 0.13 89.6%
b33 46.385 3.07 36.341 1.28 22.9%
b44 14.585 3.07 36.341 0.40 69.7%
b55 0.145 3.07 36.341 0.00 99.2%
b12 −54.250 1.00 14.246 −3.81 **
b13 −58.820 1.00 14.246 −4.13 **
b23 44.140 1.00 14.246 3.10 *
b14 37.120 1.00 14.246 2.61 *
b24 −59.020 1.00 14.246 −4.14 **
b34 −49.730 1.00 14.246 −3.49 **
b15 −45.760 1.00 14.246 −3.21 **
b25 30.780 1.00 14.246 2.16 5.4%
b35 23.670 1.00 14.246 1.66 12.5%
b45 −14.850 1.00 14.246 −1.04 32.3%
***

Significant at the level 99.9%;

**

Significant at the level 99%;

*

Significant at the level 95%; NS, Non-Significant.