Skip to main content
. 2018 Feb 12;10(1):65–72. doi: 10.4047/jap.2018.10.1.65

Table 1. Sintering conditions for zirconia structures in Programat S1 furnace.

Temperature 1 (℃) Temperature 2 (℃) Heating rate (℃/h) Holding time (h)
Heating phase 20 900 600 -
Holding phase 900 900 - 0.5
Heating phase 900 1450 200 -
Holding phase 1450 1450 - 2
Cooling phase 1450 900 600 -
Cooling phase 900 300 500 -