Skip to main content
. 2018 Mar 1;13(3):e0193073. doi: 10.1371/journal.pone.0193073

Table 1. Variations of annual streamflow and precipitation in Liudong River watershed.

1968–1980 (period I) 1981–2006 (period II) 2007–2013 (period III)
Mean Standard Deviation Cv Ratio of Cv Mean Standard Deviation Cv Ratio of Cv Mean Standard Deviation Cv Ratio of Cv
Runoff (m3/s) 376.56 92.04 0.24 2.00 327.16 82.57 0.25 1.67 328.33 52.87 0.16 0.73
Precipitation(mm) 1288.02 152.28 0.12 1115.82 165.33 0.15 1096.67 236.53 0.22