Skip to main content
. 2017 Nov 22;19(2):18–21. doi: 10.1002/acm2.12228

Notes on daily tests

DK1 Functional check of kVp and mA indicators
DK2 Functional check of beam‐off at key‐off
DK3 Functional check of the beam interrupt button (radiation stop and restart when the radiation on button is pressed again)
DK4 Quantitative verification of correct operation of backup timer or backup monitor unit
DK5 Quantitative dosimetric test: output reproducibility test at the chosen energies and filter combinations. If the output is stable with time, this test can be done weekly (so replaced by WK4 according to Table 2) on the condition that there are documents and reports to support it