Skip to main content
. 2018 Feb 22;8(1):34–40. doi: 10.4103/jispcd.JISPCD_381_17

Figure 1.

Figure 1

Construction of test specimens: (a) extracted premolar, (b) sectioning the crown, (c1) cementation of fiber post for direct core build-up, (c2) fabricating indirect chair-side post and core, (d1) direct composite core, (d2) cementation of indirect chair-side post and core, (e) standard preparation of cores to receive ceramic crowns, and (f) cemented ceramic crown in place