Skip to main content
. 2018 Feb 15;18(2):596. doi: 10.3390/s18020596

Table 5.

Inspection information of targets on three phase conductors.

Target Relative Coordinate (m) Preliminary Result Inspection Sequence PTZ Camera Pan/tilt Image Judgement
2.05 −12.4 −0.80 GM1 LP1-LNB-GM1-ID1 −26.1 49.3 graphic file with name sensors-18-00596-i009.jpg Y
0.55 −5.7 −0.85 GM1 LP1-LNA-GM1-ID2 −53.6 51.7 graphic file with name sensors-18-00596-i010.jpg Y
1.05 −18.9 −0.88 GM1 LP1-LNC-GM1-ID3 −80.2 41.8 graphic file with name sensors-18-00596-i011.jpg Y