Skip to main content
. 2018 Feb 7;18(2):491. doi: 10.3390/s18020491

Figure 6.

Figure 6

Raw data of selected FBG sensors during bridge construction phase on 17 October 2015: (a) Temperature time history measured by FBG-MS-NT-2; (b) Stress time history measured by FBG-MS-NS-2-3; (c) Histogram of daily stress spectrum.