Skip to main content
. 2018 Feb 7;19(2):39–43. doi: 10.1002/acm2.12272

Table 2.

Quarterly quality control tests

Designator Test Performance
Action
Quarterly (or at source replacement)
Q1 Mechanical integrity of applicators, guide tubes, connectors Functional
Q2 Internal battery power supply (power failure recovery) Functional
Q3 Source/dummy interlocks Functional
Q4 Dummy wire positional accuracy 3 mm (1 mm see note)
Q5 Radiological source positional accuracy 1 mm
Q6 Source strength calibration 5%
Q7 Source homogeneity Reproducible
Q8 Records Complete