Skip to main content
. 2018 Mar 21;9:91. doi: 10.3389/fendo.2018.00091

Figure 3.

Figure 3

FT3-plots [pmoll] over a simulation horizon of 25 days for several configurations of the TSH-T3-Shunt. The parameters GT3 and GD1 are identified via least squares optimization, separately for each model configuration. (A) No shunt included. (B) Full TSH-T3-shunt.