Table 3.
Variable | Hazard ratio | 95% confidence interval | P-value |
---|---|---|---|
C1M-Q | |||
Q2 Q3 Q4 C1M-cutoff |
1.33 0.78 1.33 1.29 |
[0.77; 2.30] [0.43; 1.43] [0.79; 2.24] [0.88; 1.89] |
0.31 0.42 0.28 0.19 |
Log2-C1M | 1.18 | [0.79; 1.26] | 0.97 |
Variable | Hazard ratio | 95% confidence interval | P-value |
---|---|---|---|
C1M-Q | |||
Q2 Q3 Q4 C1M-cutoff |
1.33 0.78 1.33 1.29 |
[0.77; 2.30] [0.43; 1.43] [0.79; 2.24] [0.88; 1.89] |
0.31 0.42 0.28 0.19 |
Log2-C1M | 1.18 | [0.79; 1.26] | 0.97 |