Skip to main content
. 2018 Apr 3;13(4):e0195328. doi: 10.1371/journal.pone.0195328

Fig 1. Scheme of a typical two-stage task.

Fig 1

The thicker arrow indicates the common transition and the thinner arrow indicates the rare transition.