Skip to main content
. 2018 Feb 3;54(2):708–728. doi: 10.1002/2017WR020970

Figure 6.

Figure 6

Observed and modeled streamflow at a monthly and annual (inset) time step at Billgundala for the WEAP model calibration (1983–1997) and validation (1998–2011) periods, and corresponding goodness of fit statistics for monthly streamflow.