Skip to main content
. 2018 Apr 13;12(2):202–213. doi: 10.4184/asj.2018.12.2.202

Table 8. Summary of progression risk.

graphic file with name asj-12-202-i008.jpg

Immaturity and maturity defined as R6/U5 and R9/U7 as previously described.