Skip to main content
. 2018 Apr 23;2018:8065252. doi: 10.1155/2018/8065252

Figure 10.

Figure 10

Wall shear stress variation along the channel walls for the simulation of malaria-infected RBCs with Hct = 45% in the 20 μm channel: (a) at time instant t = 20 ms; the number ratio of Pf-IRBC to HRBC is 1 : 19; (b) at time instant t = 40 ms; the number ratio of Pf-IRBC to HRBC is 1 : 9 (the time instants correspond to the same time instants in Figure 9).