Skip to main content
. 2018 Apr 23;2018:8065252. doi: 10.1155/2018/8065252

Figure 6.

Figure 6

Wall shear stress variation along the channel walls for the simulation of malaria-infected RBCs with Hct = 27% in the 10 μm channel. The number ratio of Pf-IRBC to HRBC is 1 : 5. The time instants for simulation are (a) t = 5 ms, (b) t = 10 ms, (c) t = 20 ms, and (d) t = 25 ms (the time instants correspond to the same time instants in Figure 5).