Table 1.
CDISatt | CDIShi | CDISall | ||||
---|---|---|---|---|---|---|
Cor. | Sig. | Cor. | Sig. | Cor. | Sig. | |
Total | 0.3748 | <2.2e-16 | 0.1825 | 2.05E-05 | 0.2406 | 1.60E-08 |
BRI | 0.2206 | 2.37E-07 | 0.2033 | 2.00E-06 | 0.2283 | 8.63E-08 |
MI | 0.4275 | <2.2e-16 | 0.1317 | 2.21E-03 | 0.2053 | 1.58E-06 |
IB | 0.2633 | 5.55E-10 | 0.2916 | 5.25E-12 | 0.3177 | 4.43E-14 |
SFT | 0.1175 | 6.38E-03 | 0.0292 | 5.00E-01 | 0.0496 | 2.51E-01 |
ECTRL | 0.1348 | 1.72E-03 | 0.1225 | 4.45E-03 | 0.1373 | 1.41E-03 |
INIT | 0.2619 | 6.87E-10 | 0.0282 | 5.14E-01 | 0.0764 | 7.67E-02 |
WM | 0.4393 | <2.2e-16 | 0.1186 | 5.87E-03 | 0.1956 | 4.87E-06 |
PO | 0.3291 | 4.67E-15 | 0.0730 | 9.05E-02 | 0.1322 | 2.12E-03 |
OM | 0.3644 | <2.2e-16 | 0.1264 | 3.32E-03 | 0.1893 | 9.85E-06 |
MONI | 0.2790 | 4.45E-11 | 0.1891 | 1.01E-05 | 0.2283 | 8.58E-08 |
R function cor.test is used for this analysis. Cor. is correlation; Sig. is significance. BRI, Behavior Regulation Index; MI, Metacognition Index; IB, Inhibit; SFT, Shift; ECTRL, Emotional Control; INIT, Initiate; WM, Working Memory; PO, Plan/Organize; OM, Organization of Materials; MONI, Monitor.