Table 2. Summary of precipitation for July–September for the intensive study years in ROMO.
Wet and dry nitrogen deposition are also included for comparison.
Year | Precipitation | Fraction of time flow upslope | Wet N deposition July–Oct (kg N/ha) | Estimated dry NH3, HNO3, , NO− deposition (kg N/ha)a | ||
---|---|---|---|---|---|---|
During upslope (mm) | Total 7/1–9/30 | Fraction during upslope | ||||
2009 | 32.6 | 102 | 33% | 33% | 1.24 | 0.38 |
2010b | 39.9 | 170.9 | 26% | 23% | 0.82 | 0.25 |
2014c | 62.8 | 221.8 | 32% | 37% | 1.37 | 0.21 |
2015 | 17.1 | 108.1 | 18% | 25% | 0.72 | 0.28 |
2016 | 23.3 | 60.4 | 30% | 27% | 0.85 | 0.35 |
Notes.
Dry ammonia deposition was calculated from daily NH3 from denuder measurements to keep the calculation consistent across all study years.
July 1–Sept 20.
July 7–Sept 30.