Skip to main content
. 2018 May 9;18(5):1493. doi: 10.3390/s18051493

Figure 11.

Figure 11

The reconstruction results of the stairs on the 1st–12th floor in a department. (a) is produced by BundleFusion [33]. The system failed and the generated surface was unpleasant. (b) is the result generated by our system. (ce) give the surface details of the stairs on the 1st–12th floor. More than 10 million points were produced by our system. The frame rate of our system was kept high and constant during the reconstruction.