Skip to main content
. 2018 Apr 27;18(5):1365. doi: 10.3390/s18051365

Table 4.

Economic benefit and phenomenal reduction of PAR achieved in this paper.

PSO-Based Residential Consumer-Centric DSM under IBR-Combined RTP Unscheduled Demand Scheduled Demand
Total Electricity Cost ($) 28.4482 28.2073 (−0.2409/improved by 0.85%)
PAR 3.3222 2.858 (−0.4642/improved by 13.97%)