Table 7.
Node Number | 200 | 300 | 400 | 500 |
---|---|---|---|---|
Improvement with Tr = 1000 m | 24.76% | 24.11% | 22.50% | 20.12% |
Tr = 2000 m | 31.17% | 26.89% | 24.62% | 23.17% |
Average Improvement | 27.96% | 25.5% | 23.56% | 21.64% |
Node Number | 200 | 300 | 400 | 500 |
---|---|---|---|---|
Improvement with Tr = 1000 m | 24.76% | 24.11% | 22.50% | 20.12% |
Tr = 2000 m | 31.17% | 26.89% | 24.62% | 23.17% |
Average Improvement | 27.96% | 25.5% | 23.56% | 21.64% |