. 2018 Apr 27;18(5):1369. doi: 10.3390/s18051369

Table 4.

Comparative analysis of geodetic and numerical displacements for the Construction (C) and Operational (O) periods. S stands for settlement and HD for horizontal displacement.

Method C O Lines
S HD S HD
FEM −0.28 0.09 −0.45 0.11 crest (CI and C)
−0.16 0.02 −0.26 0.02 berm B
−0.06 0.03 −0.13 0.04 berm A
Geodetic −0.06 0.01 −0.22 0.05 crest CI
−0.10 0.04 −0.17 0.05 C
−0.03 0.02 −0.14 0.03 berm B
−0.01 0.01 −0.07 0.02 berm A