Table 3.
period | assessment method (tonnes) | scenario used | contributors | sanitation (tonnes) (waste collected) |
---|---|---|---|---|
2004–2008 | 112.6 (22.52 × 5) | QPET30_noWCS_yr_t_p02 | DC + PC (37 villages) | 103.6 |
2009–2010 | 25 (12.521 × 2) | QPET30_wcs40_yr_t | DC + PC (37 villages) | 171.72 |
2004–2008 | 87.54 | QPET30_noWCS_yr_t | MC + FC | |
2009–2010 | 10.3 (5.15 × 2) | QPET30_WCS40_yr_2010 | MC + FC | |
2004–2010 | 235.44 | 57 villages | 275.32 | |
2011 (306 days) | 10.42 | QPET30_WCS40_2011_304d | DC + PC (37 villages) | 10.6 |
May–June 2012 (61 days) | 2.09 | QPET30_WCS40_2012_61d | DC + PC (37 villages) | 4.16 |
2.03 | QPET30_WCS70_2012_61d | DC + PC (37 villages) | ||
Mar–June 2012 (122 days) | 4.18 (2 × 2.09) | QPET30_WCS40_2012_122d | DC + PC (37 villages | 4.16 |