Table 4.
Metric | Model specifications |
---|---|
N to build models | 85a |
N to test models (independent) | 29 |
Total omission | 3.4 |
Average omission | 4.7 |
Total commission | 62.92 |
Average commission | 41.41 |
AUCb | 0.7416c,d |
N was divided into 75% training and 25% testing at each model iteration.
AUC = area under curve.
Z = 8.72 (P < 0.001).
SE = 0.0530.