Skip to main content
. 2018 May 29;14(5):e1006196. doi: 10.1371/journal.pcbi.1006196

Fig 3. Time-varying connectivity estimates for Simulation 1.

Fig 3

The TVC methods: (A) JC; (B) SD; (C) SW-15; (D) SW-29; (E) MTD; (F) TSW-15; (G) TSW-29. Only the first 500 time points are shown for illustration purposes.