Table 3.

Datasets of ground vibration measurements and design parameters for blasting at Seed Vest Quarry.

Data monitoring points Shot to monitored distance (D) [metre] Charge weight (in 50 holes) (W) [kg] Peak Particle velocity (mm/s)
Scaled distance D/W12
Vertical [mm/s] Longitudinal [mm/s] Transversal [mm/s] Vectoral Sum [mm/s]
1 300 1650 100.75 101.05 99.85 174.16 7.39
2 350 1550 74.90 73.45 73.95 128.35 8.89
3 400 1355 54.30 54.95 53.85 94.17 10.89
4 450 1555 50.25 49.75 50.05 86.63 11.22
5 500 1850 48.75 48.35 48.05 83.80 11.62
6 550 1900 35.95 36.15 36.95 62.24 12.62
7 600 1400 29.15 29.75 28.85 50.67 16.03
8 650 1100 21.15 20.55 20.95 36.17 19.60
9 700 1250 20.80 21.05 20.10 34.77 19.80
10 750 1500 21.55 20.45 21.05 36.41 19.30
11 800 1800 22.45 22.10 21.95 38.42 18.86
12 850 1950 21.75 20.65 20.05 36.85 19.25
13 900 1250 13.90 13.10 13.55 23.42 25.46
14 950 1250 12.75 11.95 12.10 21.25 26.87
15 1000 1200 10.75 11.05 10.45 18.62 28.88
16 1050 1950 15.50 14.55 15.95 26.58 23.78
17 1100 1800 13.05 13.55 12.75 22.73 25.93
18 1150 1800 12.55 11.85 12.25 21.17 27.11
19 1200 1800 11.75 10.65 11.25 19.44 28.28
20 1250 1950 10.25 11.75 10.55 18.83 28.31