Table 2.
Average start-up costs per site
| Variable | Cost component (SE) |
|
| Generalist (n = 4) | Specialist (n = 3) | |
| Start-up planning | ||
| Labor cost | $1,873a ($75) | $2,493b ($499) |
| Space cost | $8 ($1) | $11 ($3) |
| Consulting firm technical assistance | $498 ($35) | $644 ($94) |
| Total start-up planning | $2,379 ($111) | $3,147 ($587) |
| Start-up training | ||
| Labor cost | $786c ($152) | $865d ($198) |
| Space cost | $3 ($1) | $9 ($3) |
| Consulting firm training services | $753 ($69) | $1,161 ($212) |
| Total start-up training cost | $1,542 ($102) | $2,035 ($369) |
| Total start-up cost per site | $3,920 ($171) | $5,182 ($899) |
Average hourly wage $54.40;
average hourly wage $54.20;
average hourly wage $46.40;
average hourly wage $39.70.