Skip to main content
. Author manuscript; available in PMC: 2019 Feb 1.
Published in final edited form as: Ecosyst Serv. 2018 Feb 1;29:13–22. doi: 10.1016/j.ecoser.2017.10.022

Table 6.

Compromise programming calculations for the hypothetical example. All values rounded to nearest hundredth.

Criterion c1 Criterion c2 Criterion c3 Criterion c4 Di Rank
Alternative a1 1 0.13 0 0 0.08 2
Alternative a2 0.07 1 0.85 1 0.18 4
Alternative a3 0.20 0.13 0.48 0.11 0.06 1
Alternative a4 0 0 1 0.44 0.09 3

Notes: Assumed distance norm p = 2 in Eq. (7); lower values for Di correspond to preferred alternatives.