Skip to main content
. 2018;5(3):237–247.

Table 1.

DVH Parameters and OAR Constraints

Structure DVH Parameter Planning Constrainta
Optic Apparatus Dmax 10 Gyb
Optic Apparatus V8Gy -
Optic Apparatus V6Gy -
Brainstem Dmax -
Brainstem D0.5cc -
Brainstem D1cc 12 Gy
Brainstem V12Gy -
Brainstem V10Gy -
Cochlea Dmax 12 Gy
Cochlea Dmean -
Brain V25%Rx -

Abbreviations: DVH = dose volume histogram; OAR = organs at risk; VXGy = volume of OAR receiving X Gy; Dmax = maximum point dose; Dmean = mean dose; DXcc = dose received by X cc volume of OAR; V25%Rx = volume receive 25% of prescription dose. a not used for VMAT if the risk structure was not too close and possible to achieve with the natural dose fall off. b 12 Gy was used for one patient.