Skip to main content
. 2018 Sep 1;635:838–858. doi: 10.1016/j.scitotenv.2018.04.126

Fig. 6.

Fig. 6

Bi-plots of source (black) and sediment (red) samples, plots bordered in red failed to achieve the required correlation coefficient for progressing in the analysis.