Skip to main content
. 2018 Jun 21;2018:2396952. doi: 10.1155/2018/2396952

Table 12.

The calculated p-values from the functions (F8-F13) for the CBFO versus other optimizers.

Problem PSOBFO BFO FA FPA BA DA PSO
F8 1.73E-06 1.73E-06 1.73E-06 1.92E-06 1.73E-06 1.73E-06 1.92E-06
F9 1.73E-06 6.89E-05 1.73E-06 1.73E-06 1.73E-06 1.73E-06 1.73E-06
F10 1.73E-06 4.90E-04 1.73E-06 1.73E-06 1.73E-06 1.73E-06 1.73E-06
F11 1 1.73E-06 1.73E-06 1.73E-06 1.73E-06 1.73E-06 1.73E-06
F12 3.52E-06 5.79E-05 1.73E-06 1.73E-06 1.73E-06 1.73E-06 1.73E-06
F13 1.73E-06 1.92E-06 3.61E-03 1.73E-06 1.73E-06 1.73E-06 1.73E-06