Skip to main content
. 2018 Mar 13;31(8):1078–1087. doi: 10.5713/ajas.17.0237

Figure 4.

Figure 4

Predicted r2 vs observed r2 vs the mean distance between markers (cM, log scale), using the r2 in equation (3).