Engineering survey and design (D1) |
The disturbance of groundwater (F1) |
Analyzes the disturbance of the groundwater table by subway construction |
GB 50715, GB 50652 |
Engineering geological condition analysis (F2) |
Analyzes the main impact of soil physical properties, mechanical properties, and soil distribution during the construction process |
GB 50715, GB 50652 |
Survey surrounding buildings and municipal pipelines (F3) |
Detects the impact of surrounding buildings and complex municipal pipelines on subway construction. |
GB 50715, GB 50652 |
Construction drawing examination (F4) |
Construction drawing in the early stages serves as the foundation for an effective construction program |
GB 50652, GB 50656 |
Design scheme constructability review (F5) |
Checks the rationality and security of the design scheme against the constructability of the subway construction |
Moon et al. (2014) [40], |
Construction safety management measures (D2) |
Safety procedure and policy (F6) |
Determines whether there are proper safety procedures and policies for guiding team workers’ safety behavior |
FIUO, CP79, BOWES |
Safety training (F7) |
A vital factor of a successful safety program is to periodically train and educate all employees to enhance their skills and knowledge about safety at work |
JGJ59, FIUO, BOWES, CP79 |
Safety technical disclosure (F8) |
Disclose all information about the drawings, designs, and safety to the constructors before the construction |
GB 50652, JGJ59, FIUO |
Safety checks on construction site (F9) |
Safety risk identification and analysis on construction site during subway construction |
GB50652, JGJ59, FIUO, BOWES, CP79 |
Supervision of special operation (F10) |
Special operators must be provided with necessary occupational training and related certificates |
GB 50715, JGJ59 |
Creating a reasonable schedule (F11) |
Avoid the occurrence of accidents caused by rushing to meet the construction schedule |
Yu et al. (2014) [41] |
Holding regular safety consultations and meetings (F12) |
Participation in regular safety consultations and meetings to discuss work safety |
Cheng et al. (2012) [42] |
Construction sites security measures (D3) |
Personal protective equipment (F13) |
Determines whether there is enough proper and available equipment to protect team workers from injury when at work |
GB 50656, CP79 |
Machinery’s safety state (F14) |
Assesses the conditions of construction machines and tools |
GB 50715, JGJ59 |
Workplace’s safety situation (F15) |
Addresses the situation of potential safety hazards, safety accidents, or injuries in the workplace |
JGJ59, CP79 |
Guaranteeing temporary power use safety (F16) |
Determines whether there are proper safety procedures to guarantee temporary power use safety |
GB 50715, JGJ59, CP79 |
Workers’ safety behavior (D4) |
Foreman’s safety attitude (F17) |
Addresses the foreman’s attitudes toward safety problems and attitudes to promote the workers’ safety skill and knowledge within the construction teams |
Li et al. (2017) [43] |
Foreman’s competence (F18) |
Addresses the foreman’s experience and competence in dealing with safety problems within his construction team |
Li et al. (2017) [43] |
Workers’ safety awareness (F19) |
Addresses attitudes to hazards, risks, and the possibility of personal injury in the workplace. |
Yu et al. (2014) [41] |
Workers’ potential safety hazard insight (F20) |
Assesses capabilities to find or identify the potential safety hazard without warning |
Aksorn et al. (2008) [14] |
Guarantee and supervision mechanism (D5) |
Establishing project safety leading group (F21) |
Defines the organizational structure and labor division of safety supervision in subway construction |
GB 50715, GB 50656, FIUO |
Safety promotional activities (F22) |
Includes safety promotion activities through many mediums such as campaigns, publications, competitions, and contests |
Yu et al. (2014) [41] |
Ensuring the investment of the safety measures (F23) |
Determines whether the contractor’s safety measures fee is used for subway construction |
Yu et al. (2014) [41] |
Emergency rescue measures (F24) |
The emergency response plan involves making a plan to follow in the case of a critical situation or severe accident |
GB 50656, JGJ59, FIUO, COHSMS, CP79 |