Figure 2:
Coverage of confidence intervals for β1 – β2 estimated from the Riley method with standard variance estimator and the Riley method with robust variance estimator under scenarios 1–9 (denoted as S1–S9) for different settings of within-study correlation (ρWi) and between-study correlation (ρB). The between-study variations are set at 0.5, representing a relatively moderate between-study/within-study variation ratio (moderate VR). The red line refers to Riley method with robust variance estimator and the blue line refers to the Riley method with standard variance estimator.