Skip to main content
. 2018 Sep 1;35(17):2104–2116. doi: 10.1089/neu.2017.5394

FIG. 1.

FIG. 1.

Acoustic blast overpressure setup. (A,B) Shock tube assembly. (C) Compressed gas tank and controller unit, outside blast chamber. (D-F) Placement of rat in holder and positioning prior to blast. (G) Brass foil diaphragm before (lower image) and after (upper image) blast. (H) Pressure sensor assembly, end of shock tube, and animal holder.