Skip to main content
. 2018 Aug 13;9:1343. doi: 10.3389/fpsyg.2018.01343

Table 2.

Estimated variance components and percent of variance accounted for from the G-study using MTurk average ratings.

Var source Alternative uses Consequences
Estimate % Estimate %
p 0.167 24.4 0.067 11.0
i 0.069 10.2 0.000 0.00
r 0.181 26.6 0.351 56.9
p × i 0.139 20.4 0.088 14.2
p × r 0.008 1.2 0.015 2.5
r × i 0.021 3.1 0.008 1.2
p × i × r, e 0.096 14.1 0.088 14.2