Skip to main content
. 2018 Aug 23;13(8):e0200994. doi: 10.1371/journal.pone.0200994

Fig 2. Readiness index by facilities.

Fig 2

The vertical red line indicates the cut off below which a facility was considered as ‘not ready’ to manage NCDs.