Skip to main content
. 2018 Aug 1;18(8):2489. doi: 10.3390/s18082489

Figure 11.

Figure 11

The procedure before the penetration resistance test. (a) Coarse aggregate was removed; (b) remaining mortar was poured into the barrel.