Total number of function/gradient calls geometry optimisation steps of bulk silicon and a bulk silicon vacancy using different preconditioning strategies. Convergence criterion was E=1.03 eV Å−1.

System (# of atoms) Bulk geometry optimisation Vacancy geometry optimisation
ID Exp FF/UFF ID Exp FF/UFF
2 × 2 × 2 (64) 32 17 10 34 15 9
4 × 4 × 4 (512) 63 18 10 57 16 9
8 × 8 × 8 (4096) 105 21 13 96 17 11
16 × 16 × 16 (32768) 147 35 21 142 19 11