Skip to main content
. 2018 Jul 3;9(31):6490–6496. doi: 10.1039/c7sc05266a

Scheme 2. Preparation of ADCs 8: DAR = 8 (±1), average on 6 batches; and ADC 9: DAR = 6 (±0.5), average on 3 batches.

Scheme 2