Skip to main content
. Author manuscript; available in PMC: 2019 Apr 1.
Published in final edited form as: J Classif. 2018 Mar 16;35(1):29–51. doi: 10.1007/s00357-018-9248-z

Table 1.

The results of the BMARS MCMC with the two-stage BMARS MCMC. The first row corresponds to the average of 5 runs of the usual BMARS algorithm to which the two-stage runs are compared. The last column is the ratio of the two-stage time to the regular MCMC time in the first row. Note that as the subsampling percentage decreased, the speed of the two-stage algorithm increased while the acceptance rate decreased for a fixed proposal standard deviation (SD).

Subsample Percentage SD Acceptance Rate Time (sec) Time Ratio
- .0005 .31 41,594 -
15 .0005 .18 28,134 .68
10 .0005 .15 27,422 .66
5 .0005 .12 25,384 .61
1 .0005 .06 25,144 .60
1 .0001 .21 28,261 .68