Skip to main content
. 2018 Oct 3;8:14727. doi: 10.1038/s41598-018-32987-x

Figure 1.

Figure 1

Sampling scheme. The sampling points, labelled (A) (effluent of water treatment plant, after chlorine dioxide dosage and after DW reservoir), (B) (effluent of intermediate pumping station and storage reservoir), (C,D) (transport pipelines), (E) (distribution pipeline), and (F) (tap water), are indicated by red arrows. The position of the chlorine dioxide (ClO2) dosage is indicated by the blue arrow. The distance between sampling points are shown in kilometres (km).