Skip to main content
. 2018 May 23;315(3):F628–F636. doi: 10.1152/ajprenal.00068.2018

Table 1.

Operation time for SKT and DKT.

Donor Procurement Recipient Preparation Artery Anastomosis Vein Anastomosis Ureter Implantation
SKT 8–10 min 7–9 min 8–9 min 8–9 min 5–6 min
DKT 10–12 min 7–9 min 8–9 min 9–11 min 7–9 min

The operation in DKT took a similar time line as SKT for most steps except that the procurement of donors and ureter anastomosis in DKT took a few minutes longer (n = 6). DKT, dual-kidney transplantation; SKT, single-kidney transplantation.