Skip to main content
. 2018 Oct 15;13(10):e0204329. doi: 10.1371/journal.pone.0204329

Fig 1. Location of the modular reef.

Fig 1

Modular reef was deployed subtidally in 7 m depth at Steamer Rock in the Rappahannock River, Virginia in October 2000 and sampled in late May 2005.