Skip to main content
. 2018 Dec 15;228:149–157. doi: 10.1016/j.jenvman.2018.08.098

Table 2.

Head and energy requirements for the pumping of faecal sludge with different moisture contents after the addition of water into the pit.

Parameters Moisture content %
75 80 85 90 95
Water added (L) 0 700 1867 4200 11,200
Pit emptying time (min) 11 15 21 34 73
Head (m) 537 84 16 3 1
Power (W) 22,000 3500 600 100 40