Skip to main content
. 2017 Sep 21;8(10):287. doi: 10.3390/mi8100287

Table 4.

Comparison of the time consumed between positive master and negative master in every main step.

Types of Master Master Fabrication PDMS Moulding Ref.
Negative ~100 min Over night [29]
Positive ~30 min 120 min This work