Table 1.
Consensus classification | Description | Definition |
---|---|---|
Consensus in | Consensus that the metric should be included in the performance metric set | ≥70% participants scoring 7 to 9 and < 15% participants scoring 1 to 3 |
Consensus out | Consensus that the metric should not be included in the performance metric set | ≥70% participants scoring 1 to 3 and < 15% of participants scoring 7 to 9 |
No consensus | Uncertainty about the importance of the metric | Anything else |
Source: [11]