Table 4. Experimental plan for a real ship in the STDANS.
Stage | Work content | Expected time | Achievement confirmation |
||
---|---|---|---|---|---|
Preparation | 1.1 | Work handover | 1. Submit a list for this activity; 2. Specify the sailing route and points for attention (sailing direction, speed, points of identification); 3. The route distance is about 50 min, and the route length is 10–20 km. |
5 min | |
1.2 | Environment configuration | 1. Ship power supply: 220V AC; 2. Deployment of the station: AIS, GPS installation deployment location, STDANS operation, power and fixed equipment, etc. |
20 min | If completed | |
1.3 | Connectivity test | 1. Start up main server verification, and deploy standby server verification; 2. GPS data preparation (GPS must be external, warm boot is reserved for 10 min) and AIS signal verification (synchronous); 3. Identify the trial ship and perform ID locking; 4. Confirm the route and departure time. |
15 min | Complete starting | |
Operation | 2.1 | Sailing record | 1. Record the sailing data along the whole course, and verify the location of the test data online. | 50 min | Online monitor |
2.2 | Confirm the trial ship | 2. Confirm the sailing position, and identify and verify relevant ship information. | |||
2.3 | Object and ground verification | 3. Make comparison to the core markers, and confirm the relationship to the real scene (take photos and compare); 4. Ensure that the track is correct and the task is terminated. |
|||
Data validation | 3.1 | Track reconstruction | 1. Export data and display track. | Analyze and report | |
3.2 | Route confirmation | 2. Compare the photos. | |||
3.3 | Simulation play-back |
3. Analyze and report. |