Skip to main content
. 2018 Oct 31;13(10):e0206402. doi: 10.1371/journal.pone.0206402

Table 9. Outcome of BR between real and virtual targets.

Measuring points 1 2 3 4 5 6 7 8 9 10 11 12
BR for upstream white No.1 buoy for Bridge r 10.7 18.4 24.2 39.9 57.9 65.5 71.3 96.1 102.0 135.8 148.6 162.4
v 10.7 18.4 24.2 39.9 57.8 65.5 71.3 96.1 102.0 135.8 148.5 162.4
e 0 0 0 0 -0.1 0 0 0 0 0 -0.1 0
BR 0.0408
BR for downstream red No.2 buoy for Bridge r 11.9 18.0 26.1 42.8 62.4 71.7 85.2 98.5 107.6 124.8 145.0 167.2
v 11.9 18.1 26.1 42.8 62.4 71.6 85.2 98.5 107.6 124.9 145.0 167.2
e 0 0.1 0 0 0 -0.1 0 0 0 0.1 0 0
BR 0.02887
BR for Guishan TV Tower r 0 15 30 45 60 75 90 105 120 135 150 165
v 0 15 30 45 60 75 90 104.9 120 135 150 165
e 0 0 0 0 0 0 0 -0.1 0 0 0 0
BR 0.05