Skip to main content
. 2018 Sep 24;20(9):e261. doi: 10.2196/jmir.9634

Table 2.

Results of the evaluation according to group allocation.

Variable CONTa group (n=59) SIMb group (n=59) P value
Part 1 score (out of 50), mean (SD) 29.6 (6.9) 36.9 (6.6) <.001c
Part 2 score (out of 10), mean (SD) 3.1 (2.8) 5.9 (3.0) <.001c
Part 3 score (out of 40), mean (SD) 10.9 (6.5) 16.8 (6.9) <.001c
Total score (out of 100), mean (SD) 43.7 (11.3) 59.5 (10.8) <.001c
Satisfaction, n (%) 44 (75) 58 (98) <.001d

aCONT group: control group (traditional teaching).

bSIM group: simulator group (simulation teaching).

cP value determined by Student t test.

dP value determined by chi-square test.